Wednesday, 28 August 2013

Woodcarving bench and tool storage at Estrella de Sauce

I have just finished building a carving workbench which will allow four students to begin classes in woodworking.  The design allows for tools to be in the center lowered area when not in use so they won't fall off the table.

I also built and installed this storage cabinet for tools and materials.

Many thanks to volunteer Bianca Cornejo, herself a keen woodworker, who donated funds to allow this work to go forward.

I plan to build another workbench so we will be able to have eight students learning this craft.

Volunteer Axel tries his hand at woodcarving.  You can also see our traditional wood-fired oven which will soon have metal doors fitted.

Construction moves forward here in Sauce

I have been working on building a third storey 'mirador', a covered viewing deck that will look out over the lake on top of our house-to-be.


I have also been supervising the construction of a two-storey lakeside cottage for US friends Dan and Donna Factor.

Maestro Simon and helper install hardwood flooring in Dan and Donna's mirador casita

Estrella de la Selva

I've decided to name our sailing catamaran 'Estrella de la Selva' or 'Star of the Jungle' rather than 'Skydancer'.  I felt it was better to have a Spanish name and the name ties in with our Estrella de Sauce educational project and future cafe which we may name 'Cafe Estrella de Sauce'.

'Estrella de la Selva' at anchor

Wednesday, 15 May 2013

Inauguration of Estrella de Sauce

Right now I'm over in Winchester, UK visiting my mother who has been ill and also building a a deck for my sister Cath while staying with her and her family.
Before leaving Peru we celebrated the inauguration of our new permanent headquarters for Estrella de Sauce with a fiesta.  Over sixty adults and children showed up after we spent the morning painting a temporary sign in front and painting the 'horcones' (roof supporting posts) with jungle designs of vines, butterflies and geckos.
We had 3 cakes as it was also Lourdes' birthday.
The new center is already being used for classes but still lacks some finish details like properly installed electric lights, metal doors on our wood-fired oven and classroom furniture.
Thanks to Andy in Australia for sending us a donation that helped us move forward with the final construction that included a bathroom door and window.

Wednesday, 17 April 2013

The first sailing yacht in the western Amazon basin finally up and running


After almost 2 years in part-time construction  I'm happy to announce that the experimental 10 meter catamaran 'Skydancer' is just about finished.  We have been out testing the boat in a variety of wind conditions and so far everything has worked out.  The boat even tacks quite well and goes to windward about as well as a low-tech design like this can be expected.
Photo at left shows the off-center mizzen and the twin kick-up rudders connected by a length of bamboo.  We can sail right up to the shore just like a Hobie Cat.
The main mast is just a fairly straight skinny tree trunk wrapped with epoxy-impregnated fiberglass cloth.  The mainsail rides up the mast inside a length of 1/2 inch waterpipe enclosed in a U-shaped wooden molding with a slot cut in it for the sail.  Works just as well as expensive sail track and slides.  Battenless main and jib were made by Lee Sails of Hong Kong and they did a great job.  The main boom is another tree trunk and rides over 7 ft above the deck so no chance of hitting heads.  The yellow awnings were made locally from the same material used for the roofs of the 3-wheel motor taxis seen throughout Latin America. There is 8 ft standing headroom as the boat is intended for tourist daysailing here on Laguna Azul near Tarapoto.

 
The biggest problem so far is that Bondo the dog likes to eat the balsa-wood deck.    Photo shows the seating in the starboard hull with storage lockers below, also the hardware-store grade standing rigging.  Low traffic areas of the deck are just split bamboo, grows very plentifully here and is strong and light.  As you can see we are pulled up right onto the beach.  Not bad for a 33ft boat.  Still to build are a roof over the steering station and a swim ladder on the bow.

Saturday, 2 March 2013

Estrella de Sauce building campaign

Heartfelt thanks go out to friends and family members in the UK, USA, Australia, Russia and Thailand who felt moved to donate during our Indiegogo 45 day fundraiser which ended Feb 28.

Richard, Greg, Rob, Hugh and Patricia, Peter, Leo, Paul, Boris, Sarah, Yvette, Abby and Daniel, we are really grateful for your support.  And thank you Robin for making the video and providing logistics from the US unavailable in Peru.

Your donations have enabled us to get roof and gutters completed, the bathroom tiled and fixtures installed, cement floor poured, a decorative wall of wooden sticks made (for ventilation) and our traditional dome-shaped bread oven finished.

A word on finances.  We were recently approached by a european NGO with a generous funding offer that would have covered all our expenses.  We decided to turn the offer down because in order to accept the offer we would have had to become an approved institution by complying with various requirements.  We did not feel comfortable surrendering freedom and sovereignty in order to gain funding.  We want to stay small, free, independant and low-budget.  The world of the NGO's seems quite murky to me and I instinctively feel like staying clear of them.

Bottom line:  Thanks to friends and family for helping us steer clear of murky bureaucracy so we can keep things simple as we offer creative educational possibilities here in Sauce and in Ceilan near Pucallpa.
Dividing wall between classroom and crafts area made of sticks allows for ventilation

Slow but steady advances on 'Skydancer' sailing catamaran

'Skydancer' is at present jacked up on wooden blocks while I endeavor to fix some leaks using epoxy and fiberglass.  I have built and installed the swinging centerboard and the twin kick-up rudders are built and ready to be fitted.  I plan to use a length of bamboo as a linkage to join the rudders, I'll turn wooden inserts on my lathe to reinforce the hollow ends of the bamboo.
Our volunteer Inti has been helping me paint the interior as I construct seating with storage for lifejackets and other gear under.  I'm also working on the installation of a solar battery to power two electric bilge pumps, one for each hull.  Bailing by hand gets a bit tedious and it's not called the rainforest for nothing - we get quite a lot of rain here.
Swing keel made of water-resistant wood called ana
Laguna Azul with Sauce in foreground
Next week I plan to start putting down 7/8 x 5 inch deck boards made of topa also known as balsa wood to finish the platform connecting the two hulls and after that will come raising the mast.  Under sail in April?  I hope so.
New soft top for the starboard hull, port to follow shortly